[1]毕海普,雷伟刚,姜晓雨,等.基于蒙特卡罗模拟的光伏电站运行风险评估[J].常州大学学报(自然科学版),2018,30(01):22-27.[doi:10.3969/j.issn.2095-0411.2018.01.004]
 BI Haipu,LEI Weigang,JIANG Xiaoyu,et al.The Operating Risk Assessment of Photovoltaic Power Station Based on Monte Carlo Simulation[J].Journal of Changzhou University(Natural Science Edition),2018,30(01):22-27.[doi:10.3969/j.issn.2095-0411.2018.01.004]
点击复制

基于蒙特卡罗模拟的光伏电站运行风险评估()
分享到:

常州大学学报(自然科学版)[ISSN:2095-0411/CN:32-1822/N]

卷:
第30卷
期数:
2018年01期
页码:
22-27
栏目:
安全工程
出版日期:
2018-01-28

文章信息/Info

Title:
The Operating Risk Assessment of Photovoltaic Power Station Based on Monte Carlo Simulation
作者:
毕海普雷伟刚姜晓雨袁雄军王凯全
常州大学 环境与安全工程学院,江苏 常州 213164)
Author(s):
BI Haipu LEI Weigang JIANG Xiaoyu YUAN Xiongjun WANG Kaiquan
School of Environmental & Safety Engineering, Changzhou University, Changzhou 213164, China
关键词:
分布式光伏电站 动态风险评估 蒙特卡罗方法 Crystal Ball软件
Keywords:
distributed photovoltaic power station dynamic risk assessment Monte Carlo method Crystal Ball
分类号:
X 9
DOI:
10.3969/j.issn.2095-0411.2018.01.004
文献标志码:
A
摘要:
分布式光伏电站的健康安全运行是实现太阳能广泛应用的重要保障之一。建立了基于蒙特卡罗模拟的动态风险评估方法,确定了影响电站运行输出功率、直流电压、直流电流、温度、风速、瞬间辐射量6个主要评估动态因素,以某分布式光伏电站为例,监测数据拟合得出指标分布函数的A-D检验的P值均<1.5,拟合良好; 进一步构造动态风险值的IF函数模型计算电站的运行风险,平均值为24.87,89.70%时间都处于正常运行,与实际运行情况吻合; 敏感性图和数据得出最大的两个风险影响因素是电压(-0.49)和功率(+0.35),为风险的管理和转移提供依据。基于蒙特卡罗模拟的分布式光伏电站的定量动态风险值分析为评估分布式光伏电站系统的运行状态提供科学依据。
Abstract:
The safety operation of distributed photovoltaic power station is one of the major driving factors to achieve the extensive use of solar energy resources. The dynamic risk assessment method was established with output power, voltage, current, temperature, wind and solar radiant quantity as indexes to analyze the operating risk of the distributed photovoltaic power station based on Monte Carlo simulation. The application results of one distributed photovoltaic power station showed that the fitting distribution function matched well with monitoring data as the P value of A-D test was less than 1.5 for each index. Moreover,the average simulated risk based on IF function model was 24.87 with 89.70 percent good running of the studied time, which matched well with monitoring operating situation. It was concluded that the main factors to the operation risk of distributed photovoltaic power station were voltage(-0.49)and output power(+0.35)according to the sensibility graph and data, which could provide reference for the management and transfer of risk. The quantitative analysis of dynamic risk assessment based on Monte Carlo simulation could assist in the monitoring and adjusting suggestion for distributed photovoltaic power station.

参考文献/References:

[1]KUNDUR P,PASERBA J, AJJARAPU V,et al. Denition and classication of power system stability IEEE/CIGRE joint task force on stability terms and denitions[J].IEEE Trans Power Syst,2004,19(3):1387-1401.
[2]MCCALLEY J D, XIAO F, JIANG Y, et al. Computation of contingency probabilities for electric transmission decision problems[C]// International Conference on Intelligent Systems Application To Power Systems. Arlington VA, USA: IEEE Xplore, 2005: 540-545.
[3]赵争鸣.大容量并网光伏电站技术综述[D].北京:清华大学,2010.
[4]GUIKEMA S D, QUIRING S M, HAN S R. Prestorm estimation of hurricane damage to electric power distribution systems[J]. Risk Analysis, 2010, 30(12):1744-1752.
[5]GABBAR H A, ISLAM R, ISHAM M U, et al. Risk-based performance analysis of microgrid topology with distributed energy generation[J]. International Journal of Electrical Power & Energy Systems, 2012, 43(1):1363-1375.
[6]ALVEHAG K, SODER L. A reliability model for distribution systems incorporating seasonal variations in severe weather[J]. IEEE Transactions on Power Delivery, 2011, 26(2):910-919.
[7]植耀玲. 基于蒙特卡洛模拟对雷击风险评估风险值不确定性的探讨[D]. 南京:南京信息工程大学, 2011.
[8]NIKNAM T, TAHERI S I, AGHAEI J, et al. A modified honey bee mating optimization algorithm for multiobjective placement of renewable energy resources[J]. Applied Energy, 2011, 88(12):4817-4830.
[9]ROCCHETTA R, LI Y F, ZIO E. Risk assessment and risk-cost optimization of distributed power generation systems considering extreme weather conditions[J]. Reliability Engineering System Safety, 2014, 136(1):47-61.
[10]詹姆斯.R.埃文斯.模拟与风险分析[M].上海:上海人民出版社,2001.
[11]白雪,耿凯,潘新星,等. 层次分析法在农村生活污水处理工艺评价中的应用[J]. 常州大学学报(自然科学版),2013,25(3):13-16.

备注/Memo

备注/Memo:
收稿日期:2017-07-17。
基金项目:江苏省高等学校自然科学研究项目(16KJB620001); 建筑消防工程技术公安部重点实验室开放课题(KFKT2015ZD03); 公安部科技项目(2016JSYJD04)。
作者简介:毕海普(1982—),女,河南南阳人,博士,讲师。通信联系人:王凯全(1950—),E-mail:wkq@cczu.edu.cn
更新日期/Last Update: 2018-02-20