参考文献/References:
[1]SUÁREZ-RUIZ I, DIEZ M A, RUBIERA F. Coal[M]//New Trends in Coal Conversion. Amsterdam: Elsevier, 2019: 1-30.
[2]吴娜. 焦炭塔循环载荷下的疲劳分析[D]. 北京: 中国石油大学, 2009.
[3]PENSO J, TSAI C L, HOWDEN D G, et al. Assessing deterioration conditions in coke drums[J]. Welding Journal, 2000, 79(8): 45-52.
[4]刘人怀, 宁志华. 焦炭塔鼓胀与开裂变形机理及疲劳断裂寿命预测的研究进展[J]. 压力容器, 2007, 24(2): 1-8.
[5]SATAPATHY A K. Thermal analysis of an infinite slab during quenching[J]. Communications in Numerical Methods in Engineering, 2000, 16(8): 529-536.
[6]YAN Z, ZHANG Y X, CHEN J, et al. Statistical method for the fatigue life estimation of coke drums[J]. Engineering Failure Analysis, 2015, 48: 259-271.
[7]CHEN J, XIA Z H. Fatigue behaviour of coke drum materials under thermal-mechanical cyclic loading[J]. Theoretical and Applied Mechanics Letters, 2014, 4(4): 41006.
[8]DONG J H, GUO L L, GAO B J. A finite element analysis of the cyclic plasticity behavior of circumferential weld of coke drum under moving axial temperature gradient[J]. Procedia Engineering, 2015, 130: 307-321.
[9]GONZÁLEZ J L, GÓMEZ S, GÓMEZ G. Analysis of the mechanical behavior of a delayed coker drum with a circumferentially cracked skirt[J]. Procedia Structural Integrity, 2017, 3: 33-40.
[10]张绍良, 任明皓, 卜华全. 大型Cr-Mo钢焦炭塔焊接返修技术[J]. 压力容器, 2018, 35(2): 59-65.
[11]刘在康, 柴斌斌, 何通东. 某延迟焦化装置中焦炭塔的裙座裂纹原因分析[J]. 特种设备安全技术, 2018(5): 22-25.
[12]彭蕾. 焦炭塔裙座角焊缝开裂失效分析与处理[J]. 石油化工设备技术, 2007, 28(5): 54-55.
[13]高琪, 张亚新. 焦炭塔筒体和裙座连接部位热力耦合分析[J]. 中国石油和化工标准与质量, 2013, 34(5): 35.
[14]张绍良, 梁文彬, 张韶伟, 等. 焦炭塔安全性分析研究进度与展望[J]. 石油化工设备, 2018, 47(2): 38-45.
[15]CHEN J, YAMAMOTO T, XIA Z H, et al. Experimental evaluation of fatigue life of coke drum materials with weld sections[C]. Paris: [s.n.], 2014.
[16]王清栋. 在用15CrMoR焦炭塔定期检验探究[J]. 设备管理与维修, 2017(12): 115-117.
[17]PENSO A J. Fundamental study of failure mechanisms of pressure vessels under thermo-mechanical cycling in multiphase environments[D]. Columbus: The Ohio State University, 2001.
[18]BOSWELL R S, FERRARO T. Remain life evaluation of cokedrums, plant engineering,operations,design and reliability symposium[C]. Houston: Energy Engineering Conference, 1997.
[19]DUNHAM C, CLARK R. Laser mapping of coke drums-what has been learned[C]. Louisiana: Alche Spring National Meeting, 1998.
[20]ELLIS P J, HARDIN E E. How petroleum delayed coke forms in a drum[C]. California:The Minerals,Metals and Materials Society, 1992.
[21]曹福东. 焦炭塔膨胀变形评定[J]. 中小企业管理与科技, 2009(30): 210.
[22]柳发. 焦炭塔的失效形式分析及其防范措施研究[D]. 广州: 华南理工大学, 2015.
[23]JU F, AUMULLER J, XIA Z H, et al. Global and local elastic-plastic stress analysis of coke drum under thermal-mechanical loadings[J]. Journal of Pressure Vessel Technology, 2011, 133(6): 61202.
[24]李正亮. 焦炭塔周期性倾斜对塔体和管线的安全影响评估及其治理[D]. 上海: 华东理工大学, 2017.
[25]惠志全, 林金梅, 王恋, 等. 焦炭塔定期检验案例分析[J]. 石油和化工设备, 2019, 22(11): 72-74.
[26]张玉福, 靳艳, 金铭. 焦炭塔锥体母材裂纹产生原因分析及预防措施[J]. 当代化工, 2013, 42(8): 1078-1080, 1133.
[27]陈明健, 张伟, 杨吉梅. 焦炭塔铬钼钢过渡段焊接裂纹分析[J]. 中国设备工程, 2015(8): 61-63.
[28]陈晓玲, 段滋华, 李多民. 国内外焦炭塔的研究现状及其进展[J]. 化工机械, 2009, 36(1): 56-59.
[29]刘猛, 邢爽, 尤洪川. 焦炭塔裙座裂纹分析[J]. 中小企业管理与科技, 2014(6): 314-315.
[30]侍毅. 焦炭塔裙座环焊缝裂纹原因分析及改进措施[J]. 化工机械, 2020, 47(2): 263-265.
[31]沈阳. 焦炭塔复合板裂纹原因分析及修复工艺[J]. 石油化工建设, 2012, 34(6): 76-78.
[32]周红兰. 焦炭塔裙座焊缝开裂原因分析及修复[J]. 科技创业家, 2013(20): 143.
[33]杨富明, 唐嗣伟, 赵岩, 等. 低循环比条件下的延迟焦化技术分析[J]. 石油炼制与化工, 2013, 44(4): 24-28.
[34]龚传波, 涂连涛, 张宗有, 等. 延迟焦化外甩循环油降低循环比的可行性分析[J]. 石油炼制与化工, 2017, 48(11): 60-63.
[35]刘艳, 靳松, 李金. 延迟焦化装置焦炭塔大吹汽节能研究及应用[J]. 化工管理, 2020(16): 48-49.
[36]赵岩, 王志刚, 奕龙, 等. 以水代汽工艺在延迟焦化装置上的应用[J]. 石化技术与应用, 2016, 34(5): 403-405, 427.
[37]孙世连. 延迟焦化装置焦炭塔大吹汽节能研究及应用[J]. 石化技术, 2016, 23(2): 35, 64.